Project Details
Description
The method undertaken in this project is as follows:
- Development/application of suitable reference models of the air traffic including an estimate of the Peak Instantaneous Aircraft Count (PIAC) with regard to future reference scenarios (2013+,
2020+, 2025+) as defined in [SESAR/D3] as Task 1 (PIAC Estimation);
- Development/application of suitable data/voice traffic generation models to estimate the amount of user data, as well as protocol overhead / signalling data (down to the network layer) for the above scenarios (with focus on the level 4:
2025+ scenario) based on expected ATS/AOC
applications and services defined in [Link2000], [COCRv2] and [SESAR/D3] in order to provide the consortia involved in the Iris Communication System Design Phase A study with appropriate data volume estimates for their overall system design à Task 2 (Information Volume Estimation);
- Support the consortia involved in the Iris Communication System Design Phase A study to assess the end-to-end communication system performance à Task 3 (Support to Communication Standard Assessment).
Unterstützung der Europäischen Weltraumbehörde - European Space Agency (ESA) bei der Entwicklung und Dimensionierung eines speziellen digitalen Kommunikations-Satelliten für Air Traffic Management (ATM) / Air Traffic Control (ATC) sowie Aeronautical Operational Control (AOC) Anwendungen
Acronym | ESA/Iris |
---|---|
Status | Finished |
Effective start/end date | 1/12/07 → 31/01/09 |
Fields of Science and Technology Classification 2002
- 1126 Computer networks
- 1133 Computer-aided simulation